Paver calculator
A 200 sq ft patio of 4 × 8 in pavers needs 990 pavers, about 4.4 tons of base and 0.9 tons of sand, with 10% extra.
Don’t know your size?Measure it from satellite.
Trace the patio on the satellite map and LandTape counts pavers, base and sand.
Pavers per square foot
4 × 8 in pavers run 4.5 per sq ft before waste.
| Paver | Per sq ft | Per 100 sq ft + 10% |
|---|---|---|
| 4 × 8 in | 4.5 | 495 |
| 6 × 6 in | 4 | 440 |
| 6 × 9 in | 2.67 | 294 |
| 12 × 12 in | 1 | 110 |
| 16 × 16 in | 0.56 | 62 |
| 12 × 24 in | 0.5 | 55 |
How to plan a paver patio
Pavers, base and sand, in that order of shopping.
Measure the area. Length × width in feet; add or subtract shapes for curves and cut-outs.
Pick size and pattern. Herringbone looks great and handles driveway traffic but needs more cuts.
Plan the base. 4 in of compacted base for patios, 6 in for driveways, then 1 in of sand.
How we calculate
Same math as the LandTape app. Base gets 20% for compaction; sand gets 10%.
Questions
Quick answers before you order.
How many pavers do I need per square foot?
4.5 for 4 × 8 in pavers, 4 for 6 × 6 in, 1 for 12 × 12 in and 0.56 for 16 × 16 in, before waste.
How much extra should I order?
10% for straight patterns and 15% for herringbone or diagonal layouts, which need more cuts along the edges.
How deep should paver base be?
4 inches of compacted base for patios and walkways, 6 inches or more for driveways, with 1 inch of bedding sand on top.
What goes under pavers?
Compacted crushed stone base (crusher run or road base), then a 1 inch screeded layer of concrete sand. Polymeric sand goes in the joints after.
How do I measure a curved patio?
Split it into rectangles, circles and triangles and add them up, or trace it on a satellite map in LandTape.